Green Group Canarias
Presupuesto
Placas solaresTenerife

Solar panel installation in Tenerife

Solar panel, battery and EV charger installation in Tenerife and the Canary Islands. Local installer with in-house crews. Free quote within 24h.

Escribe tu dirección y crea tu estudio con la imagen real de tu tejado.

WhatsApp

✓ Respuesta en 24h  ·  ✓ Subvenciones tramitadas  ·  ✓ Garantía de hasta 25 años

estudio gratuito

Calcula cuánto puedes ahorrar

Respuesta en menos de 24h. Sin compromiso.

Al enviar aceptas nuestra política de privacidad.

El impacto real

Números quehablan por nosotros

Datos actualizados · 2026

+1.000
Instalaciones realizadas
En las 7 islas Canarias
2,5M
kWh generados al año
Equivalente a 700 hogares
60%
Subvención media tramitada
Sin coste para el cliente
4,8
Valoración media de clientes
+200 reseñas en Google

01

A local installer, from design to maintenance

Green Group Canarias is a solar installation company based in Las Chafiras, in the south of Tenerife. We design, handle the paperwork, install and maintain solar systems with more than three in-house crews. We do not subcontract the work.

02

For homes and businesses

  • Villas and houses in Costa Adeje, Los Cristianos, Playa de las Américas, Golf del Sur, Puerto de la Cruz and the rest of the island.
  • Businesses: from small shops to systems of 1 MW and more, like the installation at the Parque Santiago shopping centres in Playa de las Américas.
Instalación de placas solares en Tenerife
Instalación de placas solares en Tenerife

03

What we install

  • Solar panels for self-consumption
  • Home batteries (Tesla, BYD, Huawei and others)
  • EV chargers (wallbox)
  • Heat pumps for hot water (aerothermal)
  • Maintenance and repairs, including systems installed by other companies

¿Te preparamos tu estudio gratuito?

04

Paperwork handled for you

Permits in the Canary Islands can be confusing if you do not speak Spanish. We take care of the town hall permit, the grid connection paperwork and any available grants. Note that in the Canaries you pay IGIC instead of the mainland VAT.

Técnicos de Green Group montando paneles
Técnicos de Green Group montando paneles

05

How it works

  1. Send us a recent electricity bill or tell us your address.
  2. We prepare a free study with the real image of your roof.
  3. A technician visits you, free of charge.
  4. Our crew installs the system, usually in 1-2 days for a home.

preguntas frecuentes

Lo que debes saber

Do you speak English?

Yes, we can handle your project in English, from the first quote to after-sales service.

Do you install outside Tenerife?

Yes, across all the Canary Islands, and we have also carried out projects in Madrid and Galicia.

Can you service a system installed by another company?

Yes. We inspect, repair and maintain systems from any installer.

estudio gratuito

Pide tu presupuesto sin compromiso

Te preparamos un estudio con tu consumo y las ayudas que te corresponden en Tenerife.

¿Prefieres hablar? +34 673 807 130 · o

Al enviar aceptas nuestra política de privacidad.

Marcas que instalamos

BYDSMASungrowTeslaCanadian SolarJinko SolarLONGiFroniusEnphaseSolarEdgeHuawei

visita técnica gratuita

Un técnico visita tu casa, gratis y sin compromiso

Propuesta personalizada con subvenciones ya descontadas en 48-72h.